banner
Products
Superior quality is expected with our CE and RoHS certified products.
Plastic Trash Can Mold with Low Price

Plastic Trash Can Mold with Low Price

Specialize in plastic Injection Mold/Hot Runner Mold/Gas Assistant Mold/High Glossy Mold/2K Injection Mold/Over Mold/IML;
Basic Info.
Model NO. RT-16090201
Runner Cold Runner
Design Software UG
Installation Fixed
Certification CE, ISO
Standard HASCO
Customized Non-Customized
Core Steel P20
Lead Time 20-25days
Surface Finish Polishing/Painting/Coating etc.
Transport Package Carton
Specification CE/SGS/RoSH
Trademark RootChina
Origin Qingdao Shandong
HS Code 8480790090
Production Capacity 360 Sets/Year
Product Description

Specialize in plastic Injection Mold/Hot Runner Mold/Gas Assistant Mold/High Glossy Mold/2K Injection Mold/Over Mold/IML/Stack Mold.
Professional Plastic Injection Mould Manufacturer with about 10 years experience.

Advantage:
High quality & competitive price & professional skills.
In house strict quality control.
On time delivery.
All mold could be produced automatically

Plastic Trash Can Mold with Low Price


Plastic Trash Can Mold with Low Price

Plastic Trash Can Mold with Low Price

Plastic Trash Can Mold with Low Price


Specification:
Part Material: PC/PP/PBT/ABS/PMMA/PU/PE/PVC
Core &Cavity Steel: P20/H13//GS2344/NAK80/ASSAB718HASSAB8407
Mold Base Steel: P20/1050/S50C/
Runner: Hot or Cold
Gate Type: Sprue Gate/Pin Point Gate/Edge Gate/Submarine Gate/Fan Gate/Ring Gate
Cavity No: Single or Multiple.
Mold Base Standard: DME/LKM/HASCO/Etc.
Spare Parts Standard: DME/HASCO/DAIDO/MISUMI/Customized is acceptable.
Mold Life: 30k-1, 000 k
Cycle Time: 10-120 s
Lead Time: 30-45 days
Injection Machine: 50-1600 Ton
Offered Service:
Mold progress report and tooling schedule will be provided weekly.
The first testing sample for buyer's inspection and work out improvement requirements will be provided.
Mold testing video, 2D part drawing and 3D mold design before shipment will be provided.
Payment and Delivery
Payment: TT 50% in advance, Balance before shipment(Negotiable).
Delivery Time: 20-25 days
Specification
Design Software:UG/CAD
Analysis Software:Moldflow
Preferred Formats:STP/IGES/UG
Design Time:7-15 days
Manufacture Time:20-30 days
Delivery Time:30-45 days
Send inquiry